Railway Monitoring for Controlled Directional Drilling Projects

Rail Monitoring in Controlled Directional Drilling Projects

Published on: Apr 15, 2026

Introduction – Rail monitoring in controlled directional drilling projects near active railways

Controlled directional drilling and pipe jacking near active railways require a high level of control, documentation, and risk management.

In Denmark, contractors are required to implement digital monitoring when drilling operations exceed a certain diameter. To meet these requirements, Railmonitor delivers a standardized monitoring setup tailored for railway environments.

The recurring challenge – Ensuring safe and compliant execution

In controlled directional drilling and pipe jacking projects near railways, the same key questions arise:

  • When is track movement critical – and when is it acceptable?
  • How can contractors document compliance throughout the project?
  • How can decisions be made in time if track conditions change?

Furthermore, regulatory requirements increase the need for continuous monitoring and documented decision-making during drilling operations.

The standard solution – A proven monitoring setup

To address these challenges, Railmonitor provides a fully wireless monitoring system that can be deployed quickly and consistently across projects.

The setup typically includes

  • 1 solar-powered gateway per track
  • 21 wireless sensors
  • Beam and sleeper brackets for installation

The system is designed for

  • Fast installation (typically ~1 hour per track)
  • Continuous data collection before, during, and after drilling
  • Real-time alerts and notifications to contractors and stakeholders

Implementation – From installation to monitoring

The system is deployed through a consistent process covering installation, monitoring, and post-project evaluation.

The monitoring setup follows a consistent workflow

  1. Installation prior to drilling (typically 2 days before)
  2. Continuous monitoring throughout the drilling period
  3. 7-day monitoring after completion to ensure stability

The system enables contractors and relevant teams to

  • Subscribe to real-time notifications
  • Monitor track behavior continuously
  • Act immediately if thresholds are exceeded

Results – What you gain from monitoring

  • Continuous documentation throughout the project
  • Early warnings before critical thresholds are exceeded
  • Improved on-site decision-making
  • Compliance with infrastructure owner requirements

In addition, automated reporting ensures that all relevant stakeholders receive clear and structured documentation after project completion.

Overview of  projects – Monitoring in practice

Controlled Directional Drilling Project_Tolne

Contractor: Aarsleff Rail
Location:  Tolne, Denmark
Project Date: Jan, 2026

Monitoring of Directional drilling under winter conditions
Monitoring implemented on one track under challenging winter conditions. Ensured stable data collection and reliable decision-making throughout the project.

Controlled Directional Drilling Project_Sønderborg

Contractor: Aarsleff Rail
Location:  Sønderborg, Denmark
Project Date:  Jul 2025

Multi-track monitoring during drilling operations
Monitoring deployed across three tracks during directional drilling. Provided continuous documentation and real-time alerts for all stakeholders.

Controlled Directional Drilling Project_Viby J

Contractor: Aarsleff Rail
Location:  Viby J, Denmark
Project Date:  Apr 2025

Monitoring across multiple tracks during drilling
Monitoring implemented across three tracks before, during, and after drilling. Enabled improved coordination and full compliance with railway requirements.

Controlled Directional Drilling Project_Ry

Contractor: Danjord
Location:  Ry, Denmark
Project date: Feb 2025

Directional drilling under active railway
Monitoring implemented due to drilling above regulatory thresholds. Ensured safe execution and documented compliance throughout the project.